Año
2019
Fabricante
Modelo
Condición
Usado
Descripción
Brand / Model
Siemens SGT-400
Manufacture Year
2019
Running Hours
243 hours
Electrical Output
14.3 MW(e)
Frequency
50Hz
Fuel
Natural gas / liquid fuel, dual-fuel system
Generator Voltage
10.5kV
Supply Basis
Subject to Final Technical Review
This Siemens SGT-400 gas turbine generator set is a low-hour industrial power generation unit manufactured in 2019. The unit has only 243 running hours and 33 starts, making it a strong option for buyers looking for a cost-effective gas turbine package with short availability compared with ordering a new unit.
The package is rated at 14.3 MW electrical output, 50Hz frequency, and is designed for dual-fuel operation with natural gas and liquid fuel. It is suitable for industrial power plants, captive power projects, oil & gas facilities, steel plants, chemical plants, and distributed power generation projects.
Scope of Supply
The available package may include the following main systems and auxiliary equipment:
Siemens SGT-400 gas turbine unit
Turbine auxiliary systems
Coupling
Air intake system
Exhaust system
Fuel gas system
Liquid fuel start / fuel system
Turning gear system
Fire detection and fire protection system
Water washing and cleaning system
Generator lubrication oil system
Turbine lubrication oil system
Cooling and sealing air system
Generator set and related auxiliary equipment
Natural gas supply / treatment related system
Compressor and gas treatment auxiliaries, subject to final inspection
Control and monitoring system, subject to actual package configuration
Inspection, Testing & Technical Review
This Siemens SGT-400 gas turbine generator set is a low-running-hour unit manufactured in 2019, with only 243 operating hours and 33 starts.
Before shipment, the unit can be inspected on site. Available inspection items may include visual inspection, nameplate verification, package configuration check, control system record review, running hour verification, auxiliary system inspection, and technical document review.
According to the buyer’s project requirements, we can also support further technical checking, cleaning, preservation, dismantling preparation, packing inspection, and third-party inspection arrangement before shipment.
Main inspection and preparation scope may include:
– Verification of turbine model, generator data, running hours and starts
– Review of available control system records and operation data
– Visual inspection of gas turbine package and auxiliary systems
– Checking of air intake, exhaust, fuel, lube oil, cooling and sealing air systems
– Generator and electrical system condition review
– Confirmation of major package components and supply scope
– Pre-shipment cleaning and preservation if required
– Optional third-party inspection by SGS, BV, or other inspection agencies
– Photo and video documentation before shipment
Final inspection scope can be discussed according to the buyer’s technical requirements and project schedule.
Project Support Services
We provide professional support for used and low-hour industrial power generation equipment, from equipment inspection to export delivery. For this Siemens SGT-400 gas turbine generator set, our services can include equipment verification, technical coordination, factory inspection support, dismantling coordination, export packing, inland transportation, international shipping, and installation / commissioning guidance. Our service scope may include: – Equipment inspection and technical communication before purchase – Arrangement of factory visit or remote video inspection – Coordination of technical documents, photos and available operation records – Dismantling and loading coordination – Export packing and shipping preparation – FOB, CIF or other international trade terms according to buyer requirements – Support for customs clearance documents and shipping documents – Installation and commissioning guidance through experienced technical engineers – Spare parts and auxiliary system support when available – Long-term technical communication for industrial power projects If you are planning an industrial power generation project, please send us your project location, required output, fuel type, voltage, frequency, and expected delivery schedule. We will help check the available equipment package and provide a suitable proposal.